Location Vinton, VA
Owner: VDOT
Project Description:

Project involved 60-day road closure to replace existing culvert pipe with a new double 9’x6’ precast box culvert, including backfill, fill placement and inlet and outlet protection. The road remained open during construction, so temporary traffic lights were installed and temporary shoring was needed to build the box culvert in halves, switching traffic for each half of the box construction.