|
Under Construction |
Yadkinville Water Treatment Plant
Reservoir
Yadkinville, NC
Project Description:
This project for the Town of Yadkinville, NC is
for the construction of a dam reservoir with a
raw water intake and 2.500 linear foot of water
line to supply a new pump station for the town.
Project Cost: $600,000.00
|
|
 |
Deep Creek Watershed Dam 5D
Yadkin County, NC
Project Description:
This project consisted of 500,000 CY of
excavation along with foundation preparation,
and installation of a
Roller Compacted Concrete Dam. Groundbreaking
was held on November 25, 2008, check back often
for updated photographs and information on this
project.
Project Cost: $17 Million
|
|
 |
RTI International Metals
Martinsville, VA
Project Description:
Located in the Patriot Industrial Center in
Henry County, RTI contracted with Haymes
Brothers to perform 700,000 CY of excavation on
a very demanding schedule. The project was
delivered ahead of schedule with the mass
excavation being completed in less than 6
months.
Project Cost: $7 Million |
|
 |
Bridge Replacement over the Maury River
VDOT Project Number A50 - Rockbridge County, VA
Project Description:
This project is for the replacement of a
bridge over the Maury River. Check back
soon for information about the drill shafts and
other information about this challenging
project.
Project Cost: $11.4 Million
|
|
Under Construction |
Timber Ridge Apartments - Phase II
Lynchburg, VA
Project Description:
Grading and site utilities
for a multi residential development in
Lynchburg, VA for PEDCOR Company. A very
compact site and hilly terrain required the
installation of multiple retaining walls on the
site in order to complete the grading operations
and deliver the building pads.
Project Cost: $3 Million
|
|
 |
Liberty University Perimeter Road
Lynchburg, VA
Project Description:
This project consists of the grading
approximately 1 mile of a new perimeter access
road for Liberty University.
Project Cost: $1.4 Million
|
|
.JPG) |
Vulcan Materials Overburden Removal
Project Description:
Project Cost: $1 Million
|
|
|
Rocky Pen Reservoir Dam Excavation &
Foundation Preparation
Stafford County, VA
Project Description:
This project consisted of 300,000 CY of regular
excavation and 100,000 CY of blasting and rock
excavation along with foundation preparation for a
Roller Compacted Concrete Dam that, when
complete, will form the Rocky Pen Reservoir.
This reservoir will have a surface area of
greater than 600 acres.
Project Cost: $8.1 Million
|
|
 |
Rappahannock River
Intake & Pump Station
Stafford County, VA
Project Description:
Excavation and installation of the Rappahannock
River Intake & Pump station that will draw water
from the Rappahannock River that will then be
pumped into the Rocky Pen Run Reservoir.
Project Cost: $4.7 Million
|
|
.JPG) |
Sam's Club
Danville, VA
Project
Description:
Acting as a subcontractor for John S.
Clark Company, Haymes Brothers, Inc. was awarded
the site package for the San's Club in Danville,
VA. Along with a
demanding schedule to have the site prepared the
building pad completion was dependent on the
installation of 30,000 square foot of retaining
walls. The project was delivered on
schedule.
Project Cost: $2.5 Million
|
|
 |
Collins Drive Bridge
Danville, VA
Project Description:
Construction of a new bridge over Sandy
Creek for the City of Danville, VA. The
bridge is 200 feet long and serves a vital
artery to a new shopping center.
Project Cost: $1.1 Million
|
|
 |
Timber Ridge
Apartments - Phase I
Lynchburg, VA
Project Description:
Grading and site utilities
for a multi residential development in
Lynchburg, VA for PEDCOR Company. A very
compact site and hilly terrain required the
installation of multiple retaining walls on the
site in order to complete the grading operations
and deliver the building pads.
Project Cost: $3 Million
|
|
|
Eastern Guilford High School
Gibsonville, NC
Project Description:
Barnhill Contracting selected Haymes
Brothers to do the grading and site work for the
new Eastern Guilford County High School.
The original school was burned and to get
students back in the school, a temporary site
had to be graded for the installation of mobile
classroom units. Once this was completed
the site was graded for the construction of the
new school.
Project Cost: $3.5 Million
|
|
|
|
|
|
Amcor PET Packaging
Wytheville, VA
Project
Description:
Haymes Brothers, Inc. was
contracted contracted by Clayco, Inc. to
complete the site grading for a
713,000-square-foot PET blowmolding plant for
Amcor in Wytheville, Va. Dedicated to the supply
of PepsiCo heat set containers, primarily for
Gatorade, the plant was constructed next to a
recently constructed PepsiCo facility.
Project Cost $3.2 Million
|
|
 |
Route 58 Bypass
Danville, VA
Job description:
This project actually
consisted of two projects. The first was grading
and excavation of 1.7 Million CY of excavation and twin
bridges across the Dan River 1,800 feet long each.
Project Cost: $22 Million
The second part consisted of 2.5 Million CY of
excavation 7 overpass bridges.
Project Cost $25 Million
|
|
 |
Under Construction |
 |
Under Construction |
 |
Under Construction |