Haymes Brothers, Inc. Projects
Click On The Picture To View More






Under Construction
Yadkinville Water Treatment Plant Reservoir
Yadkinville, NC

Project Description:

This project for the Town of Yadkinville, NC is for the construction of a dam reservoir with a raw water intake and 2.500 linear foot of water line to supply a new pump station for the town.

Project Cost: $600,000.00

Deep Creek Watershed Dam 5D
Yadkin County, NC

Project Description:

This project consisted of 500,000 CY of excavation along with foundation preparation, and installation of a Roller Compacted Concrete Dam. Groundbreaking was held on November 25, 2008, check back often for updated photographs and information on this project.

Project Cost: $17 Million

RTI International Metals
Martinsville, VA

Project Description:

Located in the Patriot Industrial Center in Henry County, RTI contracted with Haymes Brothers to perform 700,000 CY of excavation on a very demanding schedule.  The project was delivered ahead of schedule with the mass excavation being completed in less than 6 months.

Project Cost: $7 Million


Bridge Replacement over the Maury River
VDOT Project Number A50 - Rockbridge County, VA

Project Description:

This project is for the replacement of a bridge over the Maury River.  Check back soon for information about the drill shafts and other information about this challenging project.


Project Cost: $11.4 Million


Under Construction

Timber Ridge Apartments - Phase II

Lynchburg, VA

Project Description:

Grading and site utilities for a multi residential development in Lynchburg, VA for PEDCOR Company.  A very compact site and hilly terrain required the installation of multiple retaining walls on the site in order to complete the grading operations and deliver the building pads. 

Project Cost: $3 Million


Liberty University Perimeter Road

Lynchburg, VA

Project Description:
This project consists of the grading approximately 1 mile of a new perimeter access road for Liberty University.

Project Cost: $1.4 Million

  Vulcan Materials Overburden Removal


Project Description:


Project Cost: $1 Million
 

 
Rocky Pen Reservoir Dam Excavation & Foundation Preparation

Stafford County, VA

Project Description:

This project consisted of 300,000 CY of regular excavation and 100,000 CY of blasting and rock excavation along with foundation preparation for a Roller Compacted Concrete Dam that, when complete, will form the Rocky Pen Reservoir.  This reservoir will have a surface area of greater than 600 acres.

Project Cost: $8.1 Million


Intake Phote
Rappahannock River Intake & Pump Station

Stafford County, VA

Project Description:

Excavation and installation of the Rappahannock River Intake & Pump station that will draw water from the Rappahannock River that will then be pumped into the Rocky Pen Run Reservoir.

Project Cost: $4.7 Million



Sam's Club
Danville, VA

Project Description:

Acting as a subcontractor for John S. Clark Company, Haymes Brothers, Inc. was awarded the site package for the San's Club in Danville, VAAlong with a demanding schedule to have the site prepared the building pad completion was dependent on the installation of 30,000 square foot of retaining walls.  The project was delivered on schedule.

Project Cost: $2.5 Million
 

Collins Drive Bridge
Danville, VA

Project Description:

Construction of a new bridge over Sandy Creek for the City of Danville, VA.  The bridge is 200 feet long and serves a vital artery to a new shopping center.

Project Cost: $1.1 Million



Timber Ridge Apartments - Phase I

Lynchburg, VA
 

Project Description:

Grading and site utilities for a multi residential development in Lynchburg, VA for PEDCOR Company.  A very compact site and hilly terrain required the installation of multiple retaining walls on the site in order to complete the grading operations and deliver the building pads. 

Project Cost: $3 Million

 
Eastern Guilford High School
Gibsonville, NC

Project Description:

Barnhill Contracting selected Haymes Brothers to do the grading and site work for the new Eastern Guilford County High School.  The original school was burned and to get students back in the school, a temporary site had to be graded for the installation of mobile classroom units.  Once this was completed the site was graded for the construction of the new school.

Project Cost: $3.5 Million

   
 


Amcor PET Packaging
Wytheville, VA

Project Description:


Haymes Brothers, Inc. was contracted contracted by Clayco, Inc.  to complete the site grading for a 713,000-square-foot PET blowmolding plant for Amcor in Wytheville, Va. Dedicated to the supply of PepsiCo heat set containers, primarily for Gatorade, the plant was constructed next to a recently constructed PepsiCo facility.

Project Cost $3.2 Million


Route 58 Bypass
Danville, VA


Job description:

This project actually consisted of two projects.  The first was grading and excavation of 1.7 Million CY of excavation and twin bridges across the Dan River 1,800 feet long each.

Project Cost: $22 Million

The second part consisted of 2.5 Million CY of excavation 7 overpass bridges.

Project Cost $25 Million


Under Construction
Under Construction
Under Construction

 

List jobs we've done private and public

 

 

 

 

 